← Paul Test
doc10232 3725-2018-02-15_Project_Information_Flyer.pdf
⬇ Export JSONBadge numbers are the reading order (depth-first). Nested children have dashed borders; grandchildren dotted. Hover a box for its type, text and attributes.
Page 1
20 item(s)
JSON
figure (3)
footer (1)
header (1)
heading (3)
text (11)
title (1)
1 · FIGURE
2 · HEADER
3 · HEADING
4 · TEXT
5 · TEXT
6 · HEADING
7 · TEXT
8 · FIGURE
9
10
11
12
13 · TITLE
14 · TEXT
15 · TEXT
16 · HEADING
17 · TEXT
18 · TEXT
19 · FIGURE
20 · FOOTER
Page 1 JSON
{
"document_id": 10232,
"page": 1,
"width_pt": 612,
"height_pt": 792,
"rotation": 0,
"pipeline_version": "paddleocr-vl-1.6+paul-48",
"engine": "paddleocr_vl",
"source_run_id": 10343,
"item_count": 20,
"counts_by_type": {
"figure": 3,
"footer": 1,
"header": 1,
"heading": 3,
"text": 11,
"title": 1
},
"build_ms": 2,
"items": [
{
"id": "p1.1",
"order": 1,
"type": "figure",
"bbox": {
"l": 30.96,
"t": 759.36,
"r": 179.52,
"b": 688.56
},
"text": "",
"attrs": {
"role": "page_header",
"block_label": "header_image"
}
},
{
"id": "p1.2",
"order": 2,
"type": "header",
"bbox": {
"l": 192.24,
"t": 763.68,
"r": 567.36,
"b": 679.44
},
"text": "Drainage Improvements on State Road 25/500/U.S. 27/301/441 (South Pine Avenue) from Southeast 10th Avenue to Southeast 31st Street Marion County Financial Project ID: 435666-1-52-01",
"attrs": {
"block_label": "header"
},
"level": 2
},
{
"id": "p1.3",
"order": 3,
"type": "heading",
"bbox": {
"l": 33.36,
"t": 667.68,
"r": 156.24,
"b": 653.28
},
"text": "Project Description",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.4",
"order": 4,
"type": "text",
"bbox": {
"l": 32.88,
"t": 650.88,
"r": 402.72,
"b": 559.2
},
"text": "The Florida Department of Transportation (FDOT) will be replacing underground storm drain systems on South Pine Avenue within the limits of Southeast 10th Avenue and Southeast 31st Street in Ocala, approximately one-quarter of a mile. The project aims to resolve flooding issues. Additional improvements include milling and resurfacing, roadway widening, reconstructing curb and gutters, installing sidewalks, and updating signage and pavement markings as well as underground components of lighting and traffic signals."
},
{
"id": "p1.5",
"order": 5,
"type": "text",
"bbox": {
"l": 33.36,
"t": 555.84,
"r": 382.08,
"b": 528.72
},
"text": "Additionally, business driveways will be reconstructed. Construction shall be staged to maintain access at all times."
},
{
"id": "p1.6",
"order": 6,
"type": "heading",
"bbox": {
"l": 33.36,
"t": 523.92,
"r": 249.6,
"b": 510.24
},
"text": "Lane Closures and Work Schedule",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.7",
"order": 7,
"type": "text",
"bbox": {
"l": 32.64,
"t": 508.08,
"r": 381.12,
"b": 481.92
},
"text": "Motorists can expect daytime construction work and periodic nighttime lane closures. Some work will take place behind barrier wall.\nAt a Glance"
},
{
"id": "p1.8",
"order": 8,
"type": "figure",
"bbox": {
"l": 420.72,
"t": 664.08,
"r": 570.24,
"b": 483.12
},
"text": "",
"attrs": {
"block_label": "image",
"embedded_text": "Contractor:\nCommercial Industrial Corp."
},
"children": [
{
"id": "p1.8.1",
"order": 9,
"type": "text",
"bbox": {
"l": 454.32,
"t": 655.92,
"r": 535.44,
"b": 640.32
},
"text": "At a Glance"
},
{
"id": "p1.8.2",
"order": 10,
"type": "text",
"bbox": {
"l": 462.24,
"t": 596.64,
"r": 527.76,
"b": 568.8
},
"text": "Total Cost: $1.7 Million"
},
{
"id": "p1.8.3",
"order": 11,
"type": "text",
"bbox": {
"l": 455.28,
"t": 560.16,
"r": 534,
"b": 532.32
},
"text": "Project Start: March 2018"
},
{
"id": "p1.8.4",
"order": 12,
"type": "text",
"bbox": {
"l": 428.4,
"t": 523.44,
"r": 561.36,
"b": 495.12
},
"text": "Estimated Completion:\nFall 2018"
}
]
},
{
"id": "p1.9",
"order": 13,
"type": "title",
"bbox": {
"l": 424.56,
"t": 633.6,
"r": 564.96,
"b": 605.76
},
"text": "Contractor: Commercial Industrial Corp.",
"level": 2
},
{
"id": "p1.10",
"order": 14,
"type": "text",
"bbox": {
"l": 33.12,
"t": 477.6,
"r": 396.48,
"b": 465.12
},
"text": "Left turns at Southeast 10th Avenue and at the SSV Professional Center will be\nEstimated Completion:\nFall 2018"
},
{
"id": "p1.11",
"order": 15,
"type": "text",
"bbox": {
"l": 33.12,
"t": 464.88,
"r": 580.8,
"b": 437.52
},
"text": "prohibited. Motorists will be directed to make a U-turn at the Southeast 31st Street intersection. Electronic message boards and other signage will be placed in advance to alert motorists of any upcoming closures and to help direct traffic."
},
{
"id": "p1.12",
"order": 16,
"type": "heading",
"bbox": {
"l": 33.84,
"t": 431.52,
"r": 221.28,
"b": 417.12
},
"text": "Pedestrian and Bicycle Safety",
"attrs": {
"block_label": "paragraph_title"
},
"level": 3
},
{
"id": "p1.13",
"order": 17,
"type": "text",
"bbox": {
"l": 33.12,
"t": 416.4,
"r": 564.96,
"b": 377.28
},
"text": "Construction activities will require temporary closures of sidewalk. Pedestrians will be directed around construction work, and are asked not to walk through the work zone. Bicyclists will be able to use the full travel lane. Motorists are reminded they must give bicyclists a minimum of three feet of clearance when driving alongside or passing them."
},
{
"id": "p1.14",
"order": 18,
"type": "text",
"bbox": {
"l": 33.6,
"t": 373.68,
"r": 416.88,
"b": 359.76
},
"text": "FDOT reminds all road users to pay attention, drive with care and always buckle up."
},
{
"id": "p1.15",
"order": 19,
"type": "figure",
"bbox": {
"l": 46.8,
"t": 355.2,
"r": 562.08,
"b": 93.12
},
"text": "",
"attrs": {
"block_label": "image",
"embedded_text": "3 1 s t S t 31 st St\nSE\nSE\n25\nS t\n3 2nd 500\nSW\nS\nP\nine\nAv e\n27\n301\n441 A ve\nKEY S P\nh\n10t\nPROJECT AREA ine SE\nN Ave"
}
},
{
"id": "p1.16",
"order": 20,
"type": "footer",
"bbox": {
"l": 104.4,
"t": 73.2,
"r": 502.8,
"b": 26.64
},
"text": "CFLRoads.com @MyFDOT_CFL | Facebook.com/MyFDOTCFL\nFor more information, please contact Sara Shepherd, Public Information Coordinator, (407) 758-8080 or sara.shepherd@dot.state.fl.us.",
"attrs": {
"block_label": "footer"
}
}
],
"excluded_furniture": {
"first": [],
"last": []
}
}